The increasing investment of power generation groups and enterprises in the new energy industry has led to a continuous growth in the number of power stations and installed capacity, which has brought challenges and difficulties to the operation and management. CYG ET has developed a monitoring system for PV power stations, which is based on the principles of intensive, process-driven, procedure-based, and standardized operations, and is designed with the concept of regional centralized management. With functions such as real-time data monitoring, equipment control, parameter adjustment, and data uploading of PV power stations, the system not only meets the needs of enterprises for panoramic operation monitoring of power stations, comprehensive statistical analysis, intelligent fault diagnosis, and scientific production management, but also caters to the requirements of power supply companies’ dispatchers for operation evaluation and management assessment of power stations.
Centralized PV Monitoring System
Product Overview
Product advantages
-
01
Multi-protocol data acquisition -
02
Reliable data transmission network -
03
Flexible access modes -
04
Intelligent early warning and fast fault location -
05
High degree of expandability and compatibility -
06
Input of massive data
Technical parameters
Item | 指标 | |
Capacity | Number of stations connected | ≥1024 |
Real-time data capacity | ≥1,200,000 | |
Control capacity | ≥100,000 | |
Calculation capacity | ≥10,000 | |
Real-time capability | Time of response of the real-time monitoring screen to a command | ≤2s |
Automatic refresh time of the screen | 1-10s (adjustable) | |
Time of automatic accident scene display | ≤10s | |
Transmission time of teleindication shift data | ≤3s | |
Time of telemetry change transmissio | ≤3s | |
Time from selecting and confirming telecontrol and teleregulation quantities to sending the command from the system | ≤1s | |
CPU load rate | Average CPU load rate of each computer node (within any 5 consecutive minutes) | <20% |
Network load rate | Load rate of LAN operation (within any 5 consecutive minutes | <20% |
Reliability | Time of switching between dual machines | Hot standby≤20s; Cold standby≤10min |
Annual availability of the system | ≥99.99% | |
MTBF of key equipment | ≥30000h | |
MTBF of peripheral equipment | ≥10000h | |
Information processing indexes | SOE inter-station resolution | ≤20ms |
Synthetic error of analog telemetry | ≤1.5% | |
Accuracy of teleindication action | =100% | |
Accuracy of telecontrol | =100% | |
Accuracy of teleregulation | ≥99.99% |