Centralized PV Monitoring System

The system is specifically designed for large-scale new energy power stations. It is compatible with Internet-based cloud architecture, making it an ideal choice for super-large real-time systems with more than one million sampling points. It has versatile applications in centralized PV stations of power generation groups and enterprises.

Product Overview

The increasing investment of power generation groups and enterprises in the new energy industry has led to a continuous growth in the number of power stations and installed capacity, which has brought challenges and difficulties to the operation and management. CYG ET has developed a monitoring system for PV power stations, which is based on the principles of intensive, process-driven, procedure-based, and standardized operations, and is designed with the concept of regional centralized management. With functions such as real-time data monitoring, equipment control, parameter adjustment, and data uploading of PV power stations, the system not only meets the needs of enterprises for panoramic operation monitoring of power stations, comprehensive statistical analysis, intelligent fault diagnosis, and scientific production management, but also caters to the requirements of power supply companies’ dispatchers for operation evaluation and management assessment of power stations.

Product advantages

  • 01

    Multi-protocol data acquisition
  • 02

    Reliable data transmission network
  • 03

    Flexible access modes
  • 04

    Intelligent early warning and fast fault location
  • 05

    High degree of expandability and compatibility
  • 06

    Input of massive data

Technical parameters

Item

指标

Capacity

Number of stations connected

1024

Real-time data capacity

≥1,200,000

Control capacity

≥100,000

Calculation capacity

≥10,000

Real-time capability

Time of response of the real-time monitoring screen to a command

≤2s

Automatic refresh time of the screen

1-10s (adjustable)

Time of automatic accident scene display

10s

Transmission time of teleindication shift data

3s

Time of telemetry change transmissio

≤3s

Time from selecting and confirming telecontrol and teleregulation quantities to sending the command from the system

1s

CPU load rate

Average CPU load rate of each computer node (within any 5 consecutive minutes)

20%

Network load rate

Load rate of LAN operation (within any 5 consecutive minutes

20%

Reliability

Time of switching between dual machines

Hot standby≤20s; Cold standby≤10min

Annual availability of the system

≥99.99%

MTBF of key equipment

≥30000h

MTBF of peripheral equipment

≥10000h

Information processing indexes

SOE inter-station resolution

≤20ms

Synthetic error of analog telemetry

≤1.5%

Accuracy of teleindication action

=100%

Accuracy of telecontrol

=100%

Accuracy of teleregulation

≥99.99%