At present, the scale of a single energy storage power plant is gradually expanding. For example, 100 MW and GW-level power plants have become the dominant trend, while the traditional 1000V energy storage system has pain points such as high cost, large floor area and low combined efficiency; CYG ET adapts to the market trend and delivers the 1500V centralized energy storage system solution, which can reduce the system power consumption cost by about 10%.
CYG ET provides integrated project services, including:
For the 1500V liquid cooling integrated solution, the scale of a single energy storage unit is 3MW/6MWh (3.35 MW/6.7MWh), which consists of two 3MWh (3.35MWh) liquid-cooling battery tanks and one 3MW (3.35MW) integrated boost inverter
For the 1500V air cooling integrated solution, the scale of a single energy storage unit is 2.5MW/5MWh, which consists of one 5MWh air-cooling battery tanks and one 2.5MW integrated boost inverter
1500V integrated boost inverter, such as 2.5MW, 3MW, 3.15MW, 3.35MW integrated boost inverters (power can be customized)
1500V energy storage converters, including 1250kW, 1500kW, 1575kW, 1675kW and 1725kW energy storage converters
Monitoring and control equipment such as energy management system
EPC and power plant operation and maintenance services